9 Billion-Dollar Chip Megafactories America Is Racing to Build Right Now
Description
Chip factories in America: the 9 billion-dollar chip megafactories America is racing to build right now, ranked from the smallest price tag to the biggest. Terafab in Texas, TSMC Arizona, Micron New York and Micron Boise, the Samsung Taylor fab, Texas Instruments Sherman, Intel Ohio, GlobalFoundries Malta and Amkor Arizona.
These chip factories are the biggest wave of American chip manufacturing since the chip was invented, driven by the CHIPS Act and the race with Taiwan and China. Every semiconductor fab in this video is a billion dollar factory: Amkor Arizona advanced packaging in Peoria, the Micron Boise memory fab, two new GlobalFoundries Malta fabs paid for by Japan, the Intel Ohio Silicon Heartland, the Samsung Taylor fab for Tesla AI chips, Texas Instruments Sherman, the Micron New York megafab in Clay, the Terafab Texas complex in Grimes County and the TSMC Arizona gigafab in Phoenix.
These are America megaprojects in chip manufacturing and USA semiconductor production: chip
Transcript
Read auto-generated transcript (3479 words)
Kind: captions Language: en In East Texas, on the grounds of a closed coal power plant, Elon Musk companies have filed plans for a chip factory that could cost up to $119 billion. And it is only number two of nine billion-dollar chip megafactories America is racing to build right now. Number one costs even more, and it is already making chips for Apple and Nvidia in the Arizona desert. Number six broke ground four years ago, and it still will not make a single chip before 2030. Look inside almost anything with a plug or a battery, and you will find chips. Phones, cars, washing machines, fighter jets, and the giant computers that run artificial intelligence. A new car can carry more than a thousand of them. The chip itself is an American invention. In the summer of 1958, an engineer named Jack Kilby built the first integrated circuit in a lab at Texas Instruments in Dallas. For decades after that, America made more chips than anyone. Then the factories moved. In 1990, plants in the United States made about 37% of the world's chips. By 2020, that share had fallen to about 12%. The rest went to Asia, where governments paid companies to build. The most advanced chips, the ones inside the newest phones and AI servers, ended up in one place above all. About 90% of them are made in Taiwan, an island about 100 miles off the coast of China, mostly by a single company, TSMC. And China itself has been pouring money into chips. In recent years, it has bought more chip-making machines than any other country on Earth. Americans felt what that meant in 2021. A chip shortage shut down car factories across the country. Lots filled with unfinished pickups that were waiting for parts worth a few dollars each. In August of 2022, the CHIPS and Science Act became law. It set aside about $52 billion, including about 39 billion to help companies build chip factories on American soil. What followed is the biggest wave of factory building this industry has ever seen in the United States. A chip factory is called a fab, and it is one of the most expensive buildings a company can put up. Inside, the air is kept far cleaner than in a hospital operating room, and a single machine can cost more than $150 million. Light is shown through a pattern onto a silicon wafer, and the chip is built up layer by layer, sometimes with more than 100 layers. One wafer can spend around 3 months inside a fab before it comes out finished. That is why a fab takes years to build and why so few companies can afford one. Here are the nine biggest chip mega factories America is racing to build right now, counted from the smallest price tag to the biggest. Number nine, Amkor, Peoria, Arizona. A chip does not leave the fab ready to use. It comes out as one of hundreds of tiny squares printed on a thin, round wafer of silicon about a foot across. Someone still has to cut those squares apart, mount each one in a case, wire it up, seal it, and test it. That last stage is called packaging, and for the most advanced chips, it has become almost as hard as making the chip itself. Here is the catch. In October of 2025, Nvidia showed off the first wafer of its Blackwell AI chips made in America at TSMC's factory in Phoenix. But to be finished, those wafers still had to be flown back to Taiwan for packaging. Amkor wants to close that gap. In October of 2025, the company broke ground on a packaging campus in Peoria on the northwest side of the Phoenix area. The plan started at about $2 billion. By the groundbreaking, it had grown to $7 billion with more than 750,000 square feet of clean room and as many as 3,000 jobs. Washington offered up to $400 million in chips money, and Arizona added its own support. Apple and Nvidia are lined up as its first big customers. The first building is due in mid-2027, with production in early 2028. Chips printed at TSMC across town will then be packaged a short drive away. Amkor finishes chips. The next factory makes the memory that every AI computer is starving for. Number eight, Micron, Boise, Idaho. Micron started in 1978 in the basement of a dental office in Boise. Today, it is the only big American company that makes memory chips, the kind that hold data while a computer works. Memory has turned into the bottleneck of the AI boom. Every AI server needs huge stacks of fast memory, and the few companies that make it, most of them in South Korea, have struggled to keep up. In September of 2022, Micron broke ground on a new fab next to its headquarters. The first building alone was a $15 billion project. It's clean room is planned at 600,000 square feet, about the size of 10 football fields, and Micron says it will be the largest single clean room ever built in the United States. The building is up. Production machines are moving in through 2026, and the first wafers are expected in 2027. And Micron is not stopping at one. Crews are already blasting rock for a second fab right beside the first, which is expected to turn out its first wafers in late 2028. Micron also plans to stack and package its fastest AI memory in the United States. A job that is done almost entirely in Asia today. Its plans for America now add up to about $200 billion, counting the factories and the research. Micron is paying for its factories itself, with some help from Washington. The next one is being paid for by a foreign government. Number seven, GlobalFoundries, Malta, New York. In the woods of Saratoga County, about 25 mi north of Albany, sits one of the largest chip plants in America. GlobalFoundries opened it in the early 2010s, and it makes chips for cars, phones, data networks, and the Pentagon. Its chips are not the smallest in the world, and they do not need to be. Most of the chips in a car, a radar, or a cell tower are built on older, cheaper processes. When those ran short in 2021, the auto lines stopped just the same. On October 14th, 2026, GlobalFoundries announced that it had been chosen to run two brand new fabs at Malta. The money comes from Japan under the trade and investment deal between Tokyo and Washington. It adds up to as much as $21 billion, about 10 billion for each fab. As part of the arrangement, the US Commerce Department gets a stake of about 4% in GlobalFoundries. The site already has its permits, and groundbreaking on the first fab is expected before the end of 2026. It is due to come online in 2029. Each new fab is expected to add about 900,000 wafers a year. Apple, General Motors, and the Japanese chip maker Renesas have all said they want what comes out of it. The project is expected to bring about 27,000 construction and supplier jobs, and more than 1,000 jobs inside the fabs. GlobalFoundries could build fast because the site was ready. The next project shows what happens when the money and the customers are not. Number six, Intel Ohio 1, New Albany, Ohio. In September of 2022, the president of the United States came to a field of farmland east of Columbus to break ground on what Intel called the Silicon Heartland. The plan was two fabs on about 1,000 acres for more than $28 billion with chips coming out in 2025. Ohio promised $600 million in grants as long as the site was running with 3,000 workers by the end of 2028. Then, Intel itself got into trouble. It lost ground to TSMC in making the most advanced chips. Its sales fell, and it cut thousands of jobs. The Ohio schedule slipped to 2026. Then, it slipped again. Intel now says the first fab will be finished in 2030 and running by the end of 2031. Construction never stopped, but it slowed down. Crews have poured about 200,000 cubic yards of concrete and finished the basement level. Washington had already promised about 1 and 1/2 billion dollars in chips money for the Ohio site. Then, in 2025, the federal government went further and took a stake of about 10% in Intel itself. In October of 2026, workers lifted the first major steel truss into place on the main building. It is the clearest sign yet that the Ohio fab is still rising. What Ohio is still missing is a big outside customer. Intel says it will speed up only when demand is there. Intel is still looking for its big customer. The next fab found one worth 16 and 1/2 billion dollars. Number five, Samsung, Taylor, Texas. Taylor is a town of about 16,000 people northeast of Boston. In November of 2021, Samsung chose it for a 17 billion-dollar chip factory, its biggest investment ever in the United States. The company had already been making chips in Austin since the late 1990s. So, Central Texas was familiar ground. The fab was supposed to open in 2024. It did not. Samsung's newest processes struggled to win over customers, and the building sat waiting while the company decided what to make inside it. The plans kept growing anyway. In December of 2024, Washington awarded Samsung up to about 4.7 billion dollars in chips money, and Samsung said it would invest more than 37 billion dollars in Central Texas. Then, in July of 2025, came the deal that changed Taylor's luck. Tesla signed a 16 and a half billion-dollar contract running through 2033, and Elon Musk said the Taylor fab would make Tesla's next AI chips. The plant is now being prepared to make chips on Samsung's newest 2-nanometer process. Tesla's AI 5 chip has been designed for it, and the main production run is expected in 2027. If you want to see how the biggest of these fabs get built, subscribe to Groundbreak America, because the four still ahead include a fab that opened in 3 and 1/2 years, a hundred-billion-dollar memory campus, Elon Musk's Terafab, and the largest foreign investment in American history. Samsung waited years for its customer. The next company did not wait at all, and it is the one that invented the chip. Number four, Texas Instruments, Sherman, Texas. Sherman sits about an hour's drive north of Dallas, where Jack Kilby built that first chip back in 1958. Kilby later won the Nobel Prize in Physics for it. Texas Instruments broke ground here in May of 2022. The chips it makes here are not the stars of the AI race. They are analog and embedded chips, the ones that manage power in a car, run a dishwasher, control a factory robot, or keep a battery from overheating. Almost every electronic product needs some of them. The Sherman site has room for four fabs with a potential investment of about 40 billion dollars and around 3,000 jobs. On December 17th, 2025, the first of them, called SM1, started production. It took just 3 and 1/2 years from groundbreaking. At full speed, Texas Instruments says the Sherman fabs will turn out tens of millions of chips every day. The whole site is planned for about 1.3 million square feet of clean room, and Sherman is only part of the plan. Texas Instruments says it will spend more than 60 billion dollars on seven fabs in Texas and Utah. Texas Instruments makes the chips that are everywhere. The next factory makes the ones that remember everything. And it is planned on a scale New York has never seen. Number three, Micron, Clay, New York. North of Syracuse in the town of Clay, there is an industrial park of more than a thousand acres that waited years for a tenant. In October of 2022, Micron picked it. The plan is up to four giant memory fabs built one after another over about 20 years for as much as 100 billion dollars. It is the largest private investment in the history of New York State. Micron expects about 9,000 jobs of its own and many thousands more at suppliers and contractors around Central New York. But the start dragged on. The project went through years of federal and state environmental reviews, and the groundbreaking slipped from 2024 to 2026. On January 16th, 2026, it finally happened. Micron's chief executive stood with the governor of New York, Senator Chuck Schumer, and the commerce secretary to break ground. New York put up about five and a half billion dollars in state incentives, and Washington added billions more in chips grants. This year, the work is mostly earth moving across an area the size of about 40 football fields. The steel for the first fab is due to go up next year, and the first chips are expected around 2030. A second fab is due to follow a few years later, and the last of the four would not be finished until the 2040s. Micron is building for the next 20 years. The next project wants to build bigger than anyone and faster. Number two, Terafab, Grimes County, Texas. On March 21st, 2026, Elon Musk stood inside an old power plant in Austin and announced Terafab. The idea is a chip complex for Tesla, SpaceX, and their AI business, making the chip, its memory, and its packaging under one roof. Musk's companies need staggering numbers of AI chips for cars, for robots, and for data centers, and they do not want to wait in line behind everyone else at TSMC. The first step is small by Musk's standards. Tesla broke ground in April of 2026 on a research fab at its Giga Texas campus in Austin. Musk put its cost at about $3 billion. The real Terafab is going up about 75 miles northwest of Houston in rural Grimes County, a place of about 30,000 people, cattle pastures, and pinewoods. The site sits beside the Gibbons Creek Reservoir on the grounds of a coal power plant that closed several years ago. By August, a company linked to Musk controlled more than 4,600 acres there, and land clearing had begun. County filings in May put the first phases at about $55 billion and up to $119 billion if every phase is built. In August, Tesla and SpaceX said the very first phase alone would cost about $16.8 billion. The name comes from Musk's goal of building a terawatt of AI computing power a year. Intel joined the project in April, and Terafab plans to use Intel's most advanced process, called 14A, which Intel was still finishing. The target is 100,000 wafers a month to start, and one day as many as a million. Water would come from the reservoir, and power from natural gas generators, and huge banks of batteries on the site. Grimes County approved a 10-year property tax break in exchange for at least 1,800 jobs by 2035. The first phase has a construction window from December of 2026 to the end of 2028. SpaceX itself has called the project very early, and there is no firm date yet for the first chip. Some neighbors worry about what a factory this big will do to quiet farm country, to their roads, and to their land prices. At county meetings, SpaceX representatives have had to answer their questions face-to-face. But if it is built as planned, SpaceX says it will be the largest chip factory on the planet. Terafab is still mostly a plan on paper. Number one is already making chips, and it is still growing. Number one, TSMC Arizona, Phoenix, Arizona. In May of 2020, the company that makes most of the world's advanced chips said it would build a factory in the North Phoenix desert for $12 billion. It was a bigger step than it sounds. TSMC had made its best chips almost only in Taiwan, and now it had to train an American workforce, find enough skilled tradespeople, and bring its way of running a fab halfway around the world. The early years were rough, and the start was pushed back. But the price kept climbing, $40 billion, then 65. In March of 2025, at the White House, TSMC added another $100 billion for a total of $165 billion. The company calls it the largest foreign direct investment in American history. The plan now covers six fabs, two advanced packaging plants, and a research center. Washington backed it with a grant of $6.6 billion. The first fab started high-volume production at the end of 2024, with more than 3,000 people working on the site. Its first customer was Apple, so chips made in the Arizona desert now end up inside iPhones. It makes 4-nanometer chips for customers such as Apple and Nvidia, and its yields have been reported as close to those of TSMC's plants in Taiwan. The second fab, for even smaller 3-nanometer chips, is built, and volume production is planned for the second half of 2027. The third broke ground in April of 2025 for two nanometer chips and beyond. The original site covers about 1,100 acres. In January of 2026, TSMC finished buying about 900 more acres nearby. Room for a whole second cluster of fabs. When the plan is complete, TSMC says about 30% of its most advanced chip making could be in Arizona. For the first time in decades, the best chips in the world would be made in America in serious numbers. So, that is America's chip race. A packaging campus in Peoria. Memory fabs in Boise and a $100 billion memory campus outside Syracuse. Two new fabs in Malta paid for by Japan. Intel's Silicon Heartland rising slowly in Ohio. Samsung in Taylor and Texas Instruments in Sherman. Elon Musk's Terafab on an old coal plant site. And TSMC's desert gigafab outside Phoenix. Together they add up to more than half a trillion dollars and tens of thousands of jobs in places like Sherman, Taylor, Clay and Grimes County that most Americans had never heard of. Even if all nine are finished, Taiwan will still make most of the world's most advanced chips for years to come. And China will keep building, too. But for the first time in decades, the share of chips made in America is expected to grow. If these fabs open on time, the chips inside the next car or phone you buy may have been made a few states away by people who live down the road from the factory.