← All Topics
Optimus Robot Production Integration
Optimus production lines are being prepared at both Fremont (1 million units/year capacity) and Giga Texas (10 million units/year capacity). The AI5 chip is prioritized for Optimus robots over vehicles, with production lines being installed and foundation work underway at the Texas site.
Tesla Terafab Explained: Elon Musk’s Vision for the Future of AI Chips 🚀
Ayush CosmosOptimus prioritized for AI5 chip allocation
Watch Clip →
Progress is Unreal and the site is Growing Even Larger! 27 September 2026 Terafab Update (10:15AM)
Joe TegtmeyerOptimus production facility construction advancing
Watch Clip →