← All Topics
Austin Site: Giga Texas North Campus Prep
Advanced tech fab at Giga Texas North (2M sq ft); full Terafab needs thousands of acres/10GW. Excavation underway; jobs posted.
Terafab Keynote | Building AI Chips for Earth & Space
TeslaNorth campus excavation started
Watch Clip →
Terafab Begins, Optimus & Test Track Major Construction! 23 March 2026 Giga Texas Update (09:05 AM)
Joe TegtmeyerDrone footage shows site prep
Watch Clip →
Terafab: Elon Musk’s $25 Billion Chip Gamble
The Macroscope2M sq ft advanced fab at Giga Texas
Watch Clip →