← View as cluster
Thread · March 21-25, 2026

Musk Clarifies Massive Terafab Site Needs Dwarf Giga Texas; Multiple Locations Evaluated

Post-announcement, Elon Musk distinguishes the small 'advanced technology fab' at Giga Texas from the enormous full Terafab, which requires thousands of acres and 10GW power, with sites under review.

Key facts

  • Terafab far larger than entire Giga Texas campus
  • Advanced fab for rapid chip iteration only
  • Requires unprecedented land and power infrastructure
No, that’s just the little advanced technology fab, where we will be iterating on chip designs. We couldn’t possibly fit the Terafab on the GigaTexas campus. It will be far bigger than everything else combined there. Several locations for Terafab are under consideration. It needs thousands of acres and over 10GW of power at full scale.
— @elonmusk

How the story unfolded

  1. 2 sources
  2. 6 sources
  3. 1 source
  4. 1 source
  5. 3 sources
  6. 1 source
  7. 1 source
  8. 1 source
  9. 1 source
  10. 1 source
  11. 1 source
  12. 1 source
  13. 1 source
  14. 2 sources
  15. 1 source
  16. 4 sources
  17. 1 source
  18. 2 sources
  19. 1 source
  20. 2 sources
  21. 1 source
  22. 1 source
  23. 4 sources
  24. 8 sources
  25. 1 source
  26. 1 source
  27. 1 source
  28. 2 sources
  29. 1 source
  30. 1 source
  31. 1 source
  32. 1 source

Related